TERO - Tribal Employment Rights Office
Acting TERO Director: Roberta Bearcub (509) 634-2719
RFP | Colville Indian Housing Authority, Comprehensive Housing Needs Assessment | Closing Date May 29, 2024 PDF
RFP | Janitorial Services at Chief Joseph Hatchery, Bridgeport, WA | Closing Date May 10, 2024 PDF
RFP | Construction serviced for the Antoine Creek enhancement project | Closing Date May 13, 2023 | 1 of 5 PDF, 2 of 5 PDF, 3 of 5 PDF, 4 of 5 PDF, 5 of 5 PDF
RFP | Engineering services for the Upper and Lower sƛ̓xitkʷ (Chewuch River) enhancement projects | Closing Date May 7, 2024 PDF
RFQ | Colville Indian Housing Authority Project, Bathroom Fan Project, Multi-Unit Apartment Complex, Arrow Lakes Apartments Units #29 A-F and #33 A-F, Twelve (12) Units 29 Short Cut Road Inchelium, WA 99138 | Closing Date May 8, 2024 PDF
RFB | Williams Flat Fire Salvage North Packet | Closing Date May 31, 2024 PDF
RFP | Provide Design for Motor Control Center at the Colville Tribes Resident Fish Hatchery | Closing Date May 17, 2024 PDF
RFP | Design and Construction of a 28 ft. by 8 ft 6 in Mono Hull Landing Craft Research Boat | Closing Date May 3, 2024 PDF
RFB | San Poil District Forestry has 3 excavator scalping contracts up for bid | Closing Date May 3, 2023 PDF | Devils Elbow Fire Map PDF | RFB Packet PDF
RFB | San Poil Forest, Williams Flats Fire Mechanical Scarification South | Closing Date May 3, 2024 PDF
RFQQ | Colville Tribes Resident Fish Hatchery, Design Documents for Storage Facility | Closing Date April 29, 2024 PDF
RFP | Construction services for the Beaver Creek enhancement project | Closing Date April 29, 2024 PDF | Planset PDF
RFQ | Colville Tribes Elders Luncheon | Closing Date April 29, 2024 PDF
RFB | San Poil Forestry has 3 stocking Survey Contracts up for Bid PDF | Roaring Creek SSUR 389 Acres, 583 Plots PDF | Bridge Creek 191.1 Acres, 287 Plots PDF | Summit Fire 325 Acres, 489 Plots PDF | Closing Date April 25, 2024
RFP | Little Wenatchee River Design and Engineering Services | Closing Date April 25, 2024 PDF | Cover Letter | Reach Assessment & Restoration Strategy | Q&A PDF
RFB | San Poil Forestry | 30 Mile PCT | Bridge Creek PCT | Closing Date April 25, 2024 PDF
RFQQ | Paschal Sherman Indian School HVAC Equipment Replacement Design | Closing Date April 24, 2024 PDF
RFP | Replace Roof Membrane on 3 Buildings at Chief Joseph Hatchery, Bridgeport, WA | Closing Date May 3, 2024 PDF | Q&A as of April 15, 2024 | Q&A April 30, 2024 PDF
RFP | Weaving Artistic Narratives: A Call for Local Artists to Connect in Educational Settings For Omak, Inchelium, Nespelem, and Keller Districts Colville Confederated Tribes Head Start Program | Closing Date May 15, 2024 PDF
RFP | Pascal Sherman Indian School –School Photographer for 1 year commitment | Closing Date June 20, 2024 PDF
EXPIRED / CLOSED
RFP | First Salmon Ceremony Luncheon | Closing Date April 23, 2024 PDF
RFB | Inchelium Forestry Office, 2024 Simpson Lakes Stand Exam Contract Package | Cover Letter PDF | Closing Date April 19, 2024 | Contract | Exhibit A
RFP | Twin Lakes Pum House Advertisement Notice | Closing Date April 17, 2024 PDF
RFQ | Purchasing Program, Fleet 2024-12 | Closing Date April 15, 2024 PDF
RFP | Reservation Spay and Neuter Clinic | Closing Date April 14, 2024 PDF
RFP | Install Pump House Ventilation System at Chief Joseph Hatchery, Bridgeport, WA | Closing Date April 12, 2024 PDF | Q&A PDF
RFP | Fish Health Services at Chief Joseph Hatchery, Bridgeport, WA | Closing Date April 12, 2024 PDF
RFB | Range Unit 35 Exterior Fencing Contract | Closing Date April 2, 2024 PDF
RFP | Contractor to provide equipment and training for a study to determine the best adsorption material to remove arsenic from the Nespelem Agency’s Community water system | Closing Date March 28, 2024 PDF
RFB | Whitmore/Johnson Lake Fire Herbicide Invasive Species Control | Closing Date March 28, 2024 PDF
RFB | St. Mary's Mission Fire Herbicide Invasive Species Control | Closing Date March 28, 2024 PDF
RFB | Silver Creek II Fire Herbicide Invasive Species Control | Closing Date March 28, 2024 PDF
RFB | Elmer City Fire Herbicide Invasive Species Control | Closing Date March 28, 2024 PDF
RFB | 21 Mile Grade Fire Herbicide Invasive Species Control | Closing Date March 28, 2024 PDF
RFQ | Contracting electrician services to identify existing electrical services and electrical load, create electrical schematics, and develop specifications for propane-fueled standby generators and automatic transfer switches to adequately supply electricity to the Tribe's community water systems (CWS) in the Keller, Omak and Malott communities on the Colville Indian Reservation. | Closing Date May 22, 2024 PDF
Project Manual PDF | ADDENDUM NO. 1 FOR Rocky River HUD Road Improvements PDF | Closing Date March 25, 2024 PDF | Proposal Form PDF
RFQ | Roadway Weed Control Spraying for CCT DOT | Closing Date March 25, 2024 PDF
RFQ | Roadway Striping for CCT DOT | Closing Date March 25, 2024 PDF | Amendment 1 PDF
RFQ | Mag Chloride for CCT DOT | Closing Date March 25, 2024 PDF
RFQ | Roadway Sweeping for CCT DOT | Closing Date March 25, 2024 PDF
RFQ | New construction 3 bedroom, 1 bath single family home | Closing Date March 21, 2023 PDF
RFP | Colville Gaming LLC, Architect for Design of New Office Space at 12 Tribes Coulee Dam Casino | Closing Date March 19, 2024 PDF
RFP | Colville Gaming LLC, Electrical Engineering Services for a Backup Generator at 12 Tribes Coulee Dam Casino | Closing Date March 19, 2024 PDF
RFB | CCTDOT, Rocky River HUD Road | Closing Date March 19, 2024 PDF
RFP | Replace and install new 8’ no/anti climb security perimeter fencing, new vehicle access gate and no/anti climb fence on north and south recreation areas with 3 strands of concertina wire on top of all fencing and along back roof line of Correction Facility. | Closing Date March 19, 2023 PDF
RFP | Long-term Methow habitat status and trend monitoring plan | Closing Date March 18, 2024 PDF | Q&A PDF
Indian Preference in Contracting | Certification Application | Change of Status Report and Annual Reports | Compliance & Utilization Plan 2021 | Intake Complaint Form | Small Works Roster | TERO Forestry Title 10 Application | Title 10 Employment and Contracting |
Steps to become Title 10 Certified | Job Service Order Form | W9
The Colville reservation consists of tribally owned lands held in federal trust status for the Tribes, land owned by individual Colville tribal members, most of which is held in federal trust status, and land owned by others, described as fee property and taxable by counties.